Licensed CSLB C-10 #1143599 · DIR Public Works Reg. #2000026364(949) 214-7299 · estimates@southcountycurrent.com
Home / Residential / Electrical Panel Upgrades

Electrical Panel Upgrades in South Orange County

Replace outdated or undersized panels with a modern 200A–400A service panel.

CSLB C-10 #1143599Permitted & InspectedWritten Quotes
Neatly dressed subpanel with conduit feeds

Your electrical panel is the heart of your home's power system. Many South Orange County homes built from the 1960s through the 1980s still run on original 100A panels — and some still have Zinsco or Federal Pacific Stab-Lok equipment that the industry has flagged for breakers that can fail to trip.

Today's homes ask a lot more of a panel: EV chargers, heat pumps, induction ranges, pool equipment, ADUs and battery storage. South County Current sizes, permits and installs panel upgrades that handle what you run now and what you plan to add next.

What's Included

  • Load calculation to size the new service correctly
  • Permit pulled with your city building department
  • Utility coordination for disconnect/reconnect (SCE or SDG&E)
  • New main panel, breakers and labeled circuit directory
  • Grounding and bonding brought to current code
  • Final inspection sign-off
South County Current panel upgrade with labeled circuits, EV charger breaker and solar disconnect

Signs You Need This

  • Breakers trip often or feel warm
  • Zinsco, Federal Pacific, Challenger or fuse-box equipment
  • Planning an EV charger, heat pump, ADU or remodel
  • Lights dim when large appliances start
  • No open breaker spaces for new circuits
  • Insurance or home inspector flagged the panel

Our Process

Assess

Site visit, photos or plans review, load calc where needed.

Quote

Written scope and price — no surprises.

Permit & Build

Permits pulled, utility coordinated, work completed to code.

Inspect & Close

We meet the inspector and hand over documentation.

Electrical Panel Upgrades FAQ

How long does a panel upgrade take?

Most residential panel swaps are completed in one working day on site. Total timeline depends on permit approval and utility scheduling for the disconnect and reconnect.

Do I need 200A or 400A?

We run a load calculation first. Most homes are well served by 200A; larger homes with multiple EV chargers, all-electric conversions, or ADUs may need 400A service.

Will my power be off?

Yes, for part of the install day while the utility disconnects service and we change out equipment. We schedule this in advance so you can plan around it.

Electrical Panel Upgrades Near You

Get a Free Estimate

Commercial bids: email plans to estimates@southcountycurrent.com
Clean residential breaker panel wiring by South County Current

Electrical Panel Upgrades Reviews

[REVIEW R-SVC-panel-upgrades — paste a real Google review here: quote, first name + last initial, city, service. Do not invent reviews.]

Ready to power up?

Residential & commercial electrical across South Orange County. Licensed, insured, permitted.

📞 Call (949) 214-7299